Bid Tabulation posted. Click "Tabulation" under "Related documents below to view and download the tabulation.
Amendment No. 1 - issued 04/03/2014. Click "Amendment No. 1" under "Related Documents" below to view and download amendment.
Click "ADVERTISEMENT FOR BIDS" under "Related Documents" below to view and download legal advertisement.
Project consists of the following main items:
Yah-Tah-Hey Pump Station Connection, 6± Miles North of Gallup:
1. 1,745’ of 18” Ductile Iron Pipeline.
2. A 305’ Jack and Bore Crossing of U.S. Highway 491 with 18” Ductile Iron Carrier Pipe in a 28” Steel Casing.
3. 172’ of 8” Well Collector Line Removal and Relocation.
4. Construction of Flow Control Station with 40’ of Yard Piping.
Reach 13 Waterline 3± - 6± Miles North of Gallup:
1. 16,315’ of 30” Ductile Iron Pipe.
2. A 230’ Jack and Bore Crossing of U.S. Highway 491 with 30” Ductile Iron Carrier Pipe in a 40” Steel Casing.
3. A 188’ Crossing of a 30” Gas Transmission Line with 30” Ductile Iron Carrier Pipe in a 42” HDPE Casing.
4. Several Drainage Crossings with Grade Control Structures.
5. Connections to an Existing 30” Waterline (Reach 27.5), Several Water Services, an Existing Well and future 36” Waterline (Reach 12B).
The project also includes installation of gate valves, construction of air release stations, manholes, trenching, backfilling, traffic control, and the removal and replacement of pavement and permitting.