Official bid tabulation posted below under "Related Documents". Vendor highlighted in yellow has been now officially been awarded project.
Bid results posted 03/07/2019 NO AWARD HAS BEEN MADE!! See "Tabulation 1901" under "Related Documents" below to view/download results. Once award is official, a final bid tabulation will be posted indicating awarded contractor.
This project is located along Hasler Valley Road within the City of Gallup, New Mexico. The project consists of removing two (2) existing 60 inch CMP culverts and replacing them with a concrete boxed culvert bridge consisting of three (3)-10 foot x 12 foot cells.
Work shall include demolition of existing road, installation of new asphalt pavement surface, excavation and backfill for the new culverts, concrete spillway with energy dissipators, rip rap, new permanent signage, nonwoven geotextile, geogrid reinforcement, and guardrails. Traffic control and installation of temporary bypass road will also need to be provided.
|
|
1/6/2019 8:00 AM
|
|
Gallup Sun, Albuquerque Journal
|
|
1/29/2019 2:00 PM
|
|
Frances Rodriguez frodriguez@gallupnm.gov
|
|
No
|
|
$250.00
|
|
DePauli Engineering & Surveying 307 S. 4th Street Gallup, NM 87301 (505) 863-5440
|
|
City of Gallup M-F; 8-5
|
|
(505) 722-5133
|
|
|
|