City Engineering
This division of the Public Works Department has the following responsibilities and any additional as may be directed by a Higher Authority:
2. Public Right-Of-Way(s)
3. Public & Private Drainage Easement(s)
a. Roadway(s)
b. Curb & Gutter(s)
c. Sidewalk(s) including Drivepad(s)
2. Storm Drainage & Detention
a. Roadway(s)
b. Curb & Gutter(s)
c. Sidewalk(s) including Drivepad(s)
2. Storm Drainage & Detention
• Note: Facility and utility project management are not within PW's purview unless specifically tasked by Higher Authority.
A. Infrastructure Capital Improvement Plan
2. Engineering Design including:
a. Project Certifications
a. Plans, Specifications, & Estimate
b. UA/Right-Of-Way
c. NEPA/Environmental
d. Archeological & Cultural
i. Tribal Consultations
e. NHPA/Historic Preservation
f. Utilities
i. Utility Company Notices
g. Railroad
3. Construction including:
a. Construction Management
b. Quality Assurance
a. Inspection
b. Material Testing
3. Right-Of-Way Inspection
2. Private Concrete Work (i.e. Curb & Gutters, Sidewalks, & Drivepads)
3. Private Roadway Improvements
4. Subdivision Infrastructure Construction
2. Roadway Construction
a. Base Course Placement
b. Asphalt and/or Concrete Placement
3. Drivepad(s), Sidewalk(s), and Curb & Gutter(s)
a. Setbacks
b. Forms
c. Final
4. Storm Drainage
A. JU Sidewalk Repairs
2. DOJ Consent Degree ADA Compliance (w/ Legal)
2. A/E Designs
3. Construction
Municipal Right-Of-Way/Public Easement Work Permit
Type-able R.O.W. Permit
Standard Drawings - Series 2400, July 2016
1. City Planning Support
A. Annexation & Subdivision Plat Review(s)
1. Surveying Data & Closure(s)2. Public Right-Of-Way(s)
3. Public & Private Drainage Easement(s)
B. Subdivision Infrastructure Plan Check(s)
1. Right-Of-Way Improvement(s)a. Roadway(s)
b. Curb & Gutter(s)
c. Sidewalk(s) including Drivepad(s)
2. Storm Drainage & Detention
C. Building Permit Plan Check(s)
1. Right-Of-Way Improvement(s)a. Roadway(s)
b. Curb & Gutter(s)
c. Sidewalk(s) including Drivepad(s)
2. Storm Drainage & Detention
2. ICIP Project Management
• Note: Facility and utility project management are not within PW's purview unless specifically tasked by Higher Authority. A. Infrastructure Capital Improvement Plan
B. Contract Administration
1. Feasibility Study2. Engineering Design including:
a. Project Certifications
a. Plans, Specifications, & Estimate
b. UA/Right-Of-Way
c. NEPA/Environmental
d. Archeological & Cultural
i. Tribal Consultations
e. NHPA/Historic Preservation
f. Utilities
i. Utility Company Notices
g. Railroad
3. Construction including:
a. Construction Management
b. Quality Assurance
a. Inspection
b. Material Testing
C. Fiscal Accounting
1. NMDOT Project Funding Agreements 3. Right-Of-Way Inspection
A. Municipal Right Of Way Permit(s)
1. Private Utility Cuts (i.e. Water, Wastewater, & Gas)2. Private Concrete Work (i.e. Curb & Gutters, Sidewalks, & Drivepads)
3. Private Roadway Improvements
4. Subdivision Infrastructure Construction
B. Site Inspection(s)
1. Traffic Control Compliance2. Roadway Construction
a. Base Course Placement
b. Asphalt and/or Concrete Placement
3. Drivepad(s), Sidewalk(s), and Curb & Gutter(s)
a. Setbacks
b. Forms
c. Final
4. Storm Drainage
4. FEMA/NFIP Flood Plain Management
5. Basic Engineering Surveying
6. Northwest Regional Planning Organization Technical Committee Representation
7. Other Public Functions & Services
(As Assigned By Higher Authority)A. JU Sidewalk Repairs
B. Special Projects
1. Sidewalk Program Administration2. DOJ Consent Degree ADA Compliance (w/ Legal)
C. Facility Construction Projects
1. Feasibility Studies2. A/E Designs
3. Construction
ONLINE RESOURCES
Municipal Right-Of-Way/Public Easement Work Permit
Type-able R.O.W. Permit
Standard Drawings - Series 2400, July 2016